DRC PV Solar Power Plant

LocationTshipuka, Democratic Republic of Congo
ClientIndustry Promotion Fund (FPI)

Scope of work

Hassan Allam Construction & PGESCO's scope of work includes the EPC works of 10 MW Solar Power Plant, 5 MW Storage Battery, built-in substation at PV, substation at airport and overhead transmission line with total length 23 km, Overhead transmission line spanning 15 kilometers will connect the PV plant substation to the airport substation.

Project facts

01

10 MWp photovoltaic power plant

02

A new 35/20 kV substation at the Airport

03

5 MWH energy storage system